条款目录 CONTENTS

一、 组成合同的文件: Documents Constituted Contract

二、 工程概况 General Review of Project

三、 工期 Work Term

四、 工程数量的核实和确认 Check and Confirmation of Work Quantity

五、 承包工程造价 Project Cost

六、工程质量标准与验收 Project Quality Standards and Acceptance

七、隐蔽工程检查和签证 Inspection and Confirmation of Hidden Works

八、材料的供应 Supply of Material

九、工程变更 Alteration

十、双方责任与权利 Responsibilities and Rights of Parties

十一、安全施工 Safe Construction

十二、进度计划 Progress Schedule

十三、承包工程价款支付和结算 Settlement and Payment

十四、履约担保 Performance Bond ( PB 履约金 2-5%)

1

十五、保修 Maintenance and Repair

十六、违约责任 Liabilities

十七、 其它约定 Miscellaneous

鉴于:甲方系铁路建设工程总承包商,因铁路建设需要并经过业主同意,通过招标将一号
隧道工程承包给具有隧道建设资质和能力的专业公司施工;

鉴于:乙方系专业从事隧道工程建设的施工公司,具有相应的工程资质和能力,中标承包
本合同工程;

据此,甲方将一号隧道的洞身钻爆开挖、洞门修建、防排水设施、锚网喷支护、衬砌、洞
内沟槽及洞室和相应的隧道施工附属项目承包给乙方施工,经双方协商一致,订立本合
同,共同遵守。

WHEREAS: Party A being general contractor of railway engineering will, for necessity of railway
construction and gain employer’s consent, contract through bidding No. One tunnel project to the
professional company with qualification and capability of tunnel construction for execution;

WHEREAS: Party B being the professional company of tunnel construction with corresponding
engineering qualification and capacity has won bidding and been awarded the project hereof.

NOW THEREFORE, Party, in accordance with the necessity of construction, consign the works
of Tunnel No. 1 to party B for execution, including blasting excavation, tunnel portal construction,
drainage facilities, bolting and shotcrete lining, lining, channel and ditch within tunnel in addition
to corresponding projects affiliated to tunnel engineering, for which parties by mutual agreement
conclude and enter into this contract , parties hereby agree as follows:

一、组成合同的文件: Documents Constituted Contract

组成本合同的文件包括:including the following:

1、本合同协议书 Agreement hereof

2、本合同条款 Terms and conditions hereof

3、本工程适用的标准、规范及有关技术文件

Standards, norms and concerned technical documents applicable to this engineering.
4、甲方技术交底图纸 Drawings delivered by party A, with explanation of technology.

5、附件 1《承包人承包工程项目一览表——工程量清单》,以及双方有关工程的洽商、变
更等书面协议或文件视为本合同的组成部分。

2

Appendix One: The List, Bill of Quantity of Engineering contracted by contractor in addition to
the agreements or files in writing relative to negotiation, alteration of engineering by parties hereto
will be deemed as integral parts hereof.

二、 工程概况 General Review of Project

㈠、工程名称:一号隧道。Project Name : Tunnel No. One

㈡、工程地点:DK 094+506 至 DK095 +658; Project Place:

㈢、工程规模:隧道总长 1152m 。Project Scale: Total Tunnel Length : 1152 Meters

㈣、承包范围和内容包含: Contracted Scope and Contents including as follows:

1、洞身开挖(围岩级别分类情况见工程量清单)。具体内容包括:临时设施建设、脚手
架,测量,人工挖除整修,钻眼、爆破、通风、出碴、运料、照明,管线及排水,木支撑
制作、安装、拆卸,整修边沟,超挖回填等为完成隧道开挖所需的一切工序施工、完成和
缺陷修复工作(弃碴运距从出碴洞口算起 1 公里、弃碴场用地由甲方负责)。

Tunnel Execution: The grade of surrounding rock refer to List of Quantity, particulars thereof
include as follows: temporary facilities, scaffolding, measurement, artificial digging renovation,
drilling, blasting, ventilation, ballast leaving, transport material, lighting, pipeline and drainage,
the production, installation, disassembly of wooden support, repair side ditch in addition to
backfill for over excavation and other works which are necessity for execution, complement and
defect repairs of tunnel project.

2、支护 Support

A、砂浆锚杆、中空注浆锚杆。Mortar anchor, hollow grouting anchor.

B、超前小导管–钢管加工制作、运输、脚手架、钻孔、顶管等全部制安过程;

Advanced small pipe – pipe manufacture, transport, scaffolding, drilling, pipe, jacking and all
other process of manufacture and installation.

3、衬砌,包括正洞衬砌、仰拱及其钢筋、仰拱填充、铺底、大小避车洞衬砌。

Lining, including tunnel, inverted arch and reinforcement, the inverted arch filling, bedding in
addition to lining of refuge holes of various sizes.

三、工期 Work Term
开工日期: ,竣工日期为: 。Commencement date is

, completion date is

.

3

四、 工程数量的核实和确认 Check and Confirmation of Work Quantity

1、乙方向甲方施工技术人员提交已完工程量计算单或签证,以便甲方对乙方进行验工计
价。

Party B will submit party A’s technical personnel with List of Completed Quantity or Certificate
of Quantity for party A’s acceptance and calculation of party B’s works.

2、工程量验收方法:Means of Quantity Acceptance

隧道开挖数量以隧道设计开挖断面计算;衬砌数量按照图纸设计厚度及尺寸计算;排水
沟、电缆槽按照设计图纸尺寸及附表清单单价计量;隧道砂浆锚杆、超前锚杆支护数量按
乙方依照甲方技术交底施工的实际数量计算。

Tunnel excavation quantity is calculated pursuant to excavated section in tunnel design; lining
quantity is calculated pursuant to the thickness and size of drawing’s design; quantity of drainage
ditch and cable trough are calculated under the design size in drawings and unit price in appendix
list; quantity of tunnel mortar anchor and ahead of the bolt support, subject to Party B’ actual
worked number are calculated in accordance with party A’s technical explanation.

3、乙方应按照甲方技术人员的技术交底进行施工。工程量以乙方按照甲方技术交底完成的
实际施工数量为依据。乙方完成的结算工程量须由甲方施工技术、质量检验工程师审核签
证,且须经项目总工审批后才能作为验工计价的依据。

Party B should, pursuant to the technical direction by party A’s technical personnel, carry out
execution. The quantity is the same which are actual completion by party B in accordance with
party A’s technical direction. The settlement of quantity of party B’s completion should, prior to
being deemed as the basis of the acceptance and cost calculation, be determined by the check and
confirmation of party A’s engineers of technician and quality in addition to the exam / approval of
project’s general engineer.

五、 承包工程造价 Project Cost

各分项工程承包单价为:见附件一《工程量清单》, 结算工程数量根据实际完成的合格工
程量计量。乙方根据甲方提供的施工图纸,以下述的承包单价即《附件 1:承包人承包工
程项目一览表—工程量清单》, 完成隧道工程所有项目内容施工、竣工和缺陷修复工作。

Unit price of sub-project refer to Appendix One BILL OF QUANTITY on which the settlement
quantity will be calculated on the qualified quantity completed actually by party B. Party B will, in
accordance with party A’s execution drawings and subject to the unit price, viz. Project’s List and
Quantity List, make completion of any and all items of tunnel construction including execution,
completion and defect’s repair.

4

六、工程质量标准与验收 Project Quality Standards and Acceptance

1、乙方必须严格按照甲方技术交底、现行铁路验收标准和铁路施工规范组织施工。乙方所
承包的工程,必须达到国家或本行业现行的工程质量验收标准。

Party B should, in strict conformity with party A’s technical direction and existing railway
acceptance standard / norm, carry out execution hereof. The project contracted by party B should
satisfy to the acceptance standard which are stipulated by state or industry.

2、凡因乙方原因造成的施工质量不合格的工程,乙方应在规定的时间内无偿进行返工,如
果返工后仍达不到验收标准的,甲方有权委派其它单位或个人进行整修,费用由乙方承
担。

Provided that any defect / unqualified work in project execution due to party B, rework should be
carried out by party B in free, where the rework is still not satisfy acceptance standard, party A is
entitle to dispatch other contractor or individual to conduct repair for which the cost will be on
party B’s account.

七、隐蔽工程检查和签证 Inspection and Confirmation of Hidden Works

1、甲方质检人员在对隐蔽工程检查前,乙方应进行严格的自行检查。

Respect to hidden work party B should conduct self-strict exam before the inspection by party A’s
quality inspector.

2、乙方每进行一道工序施工前,必须及时通知甲方,对上道工序完成工程量的确认。

Party B should, prior to conduct next work procedure, give notice timely to party A for
confirmation of the completion quantity in ahead procedure.

八、材料的供应 Supply of Material

甲方提供给乙方材料单价:主要材料按市场价格执行,其他非甲方供应材料由乙方自行采
购,质量满足相应标准。

The price of materials which are supplied by party A to party B: main materials will be subject to
marked price, other non-party A’s provision of materials, the quality thereof should be satisfaction
with corresponding standards, will be purchased by party B itself.

九、工程变更 Alteration

1、建设单位和甲方对原工程设计进行的变更,乙方必须服从。

Any alteration to original design by employer and / or party A should be conformed with by party
B.

2、因变更延误的工期经甲方批准后相应顺延。

The delayed term due to alteration may, be subject to party A’s approval, be allowed

5

 

铁路隧道工程施工承包合同(中英文) 下载链接: https://u253469.ctfile.com/fs/253469-231950938

欢迎关注 “找知博客 ” 获取更多,如链接失效,请微信博主

微信号: slvx399399(司令微信首字母缩写+399399)

 

本文来自网络,不代表找知博客立场,转载请注明出处:http://zhaozhiyong.cn/1523.html

作者: 于老大

关注微博
返回顶部
//