国际承包工程合同(中英完整版)-word模板ppt模板excel模板office免费下载-找知博客

Contract for Works of Civil Engineering Construction 土木…

image

Contract for Works of Civil Engineering Construction

土木工程施工合同

This CONTRACT is made on the _th of_(month), _(year) by and between_(hereinafter
called “Party A”) of the one part, and _(hereinafter called “Party B”) of the other
part.

_公司(以下简称“雇主”)与_公司(以下简称“承包商”)于_年_月_日特签订本
合同。

WHEREAS 鉴于。。。

NOW THEREFORE THIS CONTRACT WITNESSETH that it is hereby agreed by and
between the parties hereto as follows:

双方达成协议如下:

civil engineering 土木工程

Chapter 1 Definitions and Interpretation

Article 1 Definitions
In the Contract (as hereinafter defined) the following words and expressions shall have
the meanings hereby assigned to them, except where the context other requires:

第一条 定义
本合同(按下文所定义的)中的下列词和用语,除文中另有要求者外,
应具有本条所赋予的含义:

1.1 “employer” means the person named as such in this contract and the legal
successors in title to such person, but not (except with the consent of the
Contractor) any assignee of such person.

1.1 “雇主”是指本合同所指明的当事人以及取得当事人资格的合法继承人,但除
非承包商同意,不包括此当事人的任何受让人,本合同中的雇主为_(填入名

称)。
1.2 “Contractor” means the person whose tender has been accepted by the
Employer and the legal successors in title to such person but not (except with
the consent of the Employer) any assignee of such person.

1.2 承包商是指其标书已为雇主接受的当事人以及取得此当事人资格的合法继承
人,但除非雇主同意,不指此当事人的任何受让人。本合同中的雇主为_(填入
名称)。

1.3 “Subcontractor” means any person named in the Contract as a Subcontractor for
a part of the Works or any person to whom a part of the works has been
subcontracted with the consent of the engineer and the legal successors in title
to such person, but not any assignee of any such person.

1.3“分包商”是指本合同中指定作为分包工程某一部分的分包商的任何当事人,
或由工程师同意已将工程的某一部分分包给他的任何当事人以及取得该当事人
资格的合法继承人,但不指此当事人的任何受让人。

1.4 “Engineer” means the person appointed by the employer to act as Engineer for
the purpose of the Contract and named as such in this Contract.

1.4“工程师”是指雇主为本合同目的而指定作为工程师。本合同中的工程师是指
_(填入名称)。

1.5 “Engineer Representative” means a person appointed from time to time by the
engineer under clause 9.2.

1.5“工程师代表”是指工程师根据 9.2 条款随时指定的人员。

1.6 “Contract” means this Contract, the Specification, the Drawings, the Bill of
Quantities, the Tender, the Letter of Acceptance, the Contract Agreement (if
completed) and such further documents as may be expressly incorporated in
the Letter of Acceptance or the Contract Agreement (if completed).

1.6“合同”是指合同,规范,图纸,工程量表,投标书,中标函,合同协议书以
及其他明确列入中标函或合同协议书(如已完成)中的此类进一步的文件。

1.7 “Specification” means the Specification of the Works included in the Contract
and modification thereof or addition thereto made under Clause 95 or submitted
by the Contractor and approved by the engineer.

1.7”规范“是指合同中包括的工程规范,以及根据第 95 条规定的或由承包商提
出并经工程师批准的对规范的任何修改或增补。

1.8 “Drawings”means all drawings, calculations and technical information of a
like nature provided by the engineer to the contractor under the contract and all
drawings, calculations, samples, patterns, models, operation and maintenance
manuals and other technical information of a like nature submitted by the contractor
and approved by the engineer.
technical information of a like nature 类似性质的技术资料
。。。。submitted by A and approved by B 由 A 提供并经 B 同意

1.8 图纸是指工程师根据合同向承包商提供的所有图纸,计算书和类似性质的
技术资料,以及由承包商提供并经工程师批准的所有图纸,计算书,样品,图
样,模型,操作和维修手册以及类似性质的技术资料 。

1.9 “Bill of Quantities” means the priced and completed bill of quantities forming
of the tender.

1.9 工程量表是指构成投标书一部分的已标价的以及完成的工程量表。

the priced bill of quantities forming of the tender 构成投标书的已标价的
1.10 “Tender” means the contractor’s priced offer to the employer for the
execution and completion of the works and the remedying of any defects therein
Article 26 contract agreement.

1.10 “投标书”是指承包商根据合同的各项规定,为工程的实施,完成和任何
缺陷的修补,向雇主提出并为中标函接受的报价书。

for the execution and completion of the works and the remedying of any defects

为工程的实施,完成和任何缺陷的修补

1.1 Letter of Acceptance means the formal acceptance by the engineer of the
tender.

1.1 中标函是指雇主对投标书的正式书面接受。

1.12 “Contract Agreement” means the contract agreement (if any) referred to in
Clause 26.

1.12 合同协议书是指本合同第 26 条所诉的合同协议书。

1.13 “Appendix to Tender” means the contract agreement (if any) referred to in

Clause 16.

1.13 投标书附件是指本合同第 16 条所诉的合同协议书。

总结:referred to in Clause XX 本合同第 XX 条所诉的。。。
1.14 “Commencement Date”means the date upon which the contractor receives the
including plant in notice to commence issued by the engineer pursuant to clause 74.

1.14 开工日期是指承包商接到工程师根据本合同第 74 条发出开工通知书的日
期。

1.15 “Time for Completion” means the time for completing the execution of and
passing the Tests on Completion of the Works or any Section or part thereof as
stated in the Contract calculated from the Commencement Date.

1.15 竣工时间是指合同规定从工程开工日期算起到工程或任何部分或区段施工
结束并且通过竣工检验的时间。

1.16 ”Test on Completion“ means the tests specified in the Contract or otherwise
agreed by the Engineer and the Contractor which are to be made by the Contractor
before the Works or any section or part thereof are taken by the Employer.
1.16 or otherwise agreed by the engineer and the contractor 或由工程师与承包商

另行商定的。。
竣工检验是指合同规定的或由工程师与承包商另行商定的检验,这些检验是由
承包商在雇主对工程或其任何部分或区段接收之前进行的。

Which are to be ……翻译的时候要注意,处理成”这些检验“
the Works or any section or part thereof 工程或其任何部分或区段
before the Works or any section or part thereof are taken by the Employer.

conj. 在…之前;在…以前

1.17 “Taking-over Certificate”means a certificate issued pursuant to Clause 81.

1.17 移交证书是指根据第 81 条颁发的证书。

1.18 “Contract Price” means the sum stated in the Letter of Acceptance as payable
to the contractor for the execution and completion of the works and the remedying
of any defects therein accordance with the provisions of the Contract.

1.18 合同价格是指中标函中写明的按照合同规定,为了工程的实施,完成及其
任何缺陷的修补应付给承包商的金额。

1.19 “Retention Money” means the aggregate of all monies retained by the
Employer pursuant to Clause 92.2(a).

1.19 保留金是指雇主根据第 92.2(a)规定留存的所有金额的总和。

1.20 “Works” means the Permanent Works and the Temporary Works or either of
them as appropriate.

1.20 工程是指永久工程和临时工程或视情况为二者之一。

1.21 “Permanent Works” means the permanent works to be executed concluding
plant in accordance with the contract.

1.21 永久工程是指根据合同将实施建造的永久工程包括工程设备。

1.22 “Temporary Works” means all temporary works of every kind (other than
Contractor’s Equipment) required in or about the execution and completion of the
works and remedying of any defects therein.

1.22 临时工程是指在工程实施,完成和修补其任何缺陷时需要的或有关的所有
各种临时工程,但承包商的设备除外。

1.23 “Plant” means machinery, apparatus and the like intended to form or forming
part of the Permanent Works.

1.23 工程设备是指预定构成或构成永久工程一部分的机械,仪器以及类似设
备。

1.24 “Contractor Equipment” means all appliances and things of whatsoever nature
(other than Temporary Works) required for the execution and completion of the
Works and remedying of any defects therein, but does not include Plant, materials or
other things intended to form or forming part of the Permanent Works.

1.24 承包商的设备是指在工程实施,完成及其修补缺陷过程中所需的全部装置
和任何性质的物品,但不包括预定构成或构成永久工程一部分的设备,材料或
其他物品。

1.25 “Section” means a part of the Works specifically identified in the Contract as a
section.

1.25 区段是指合同中具体指定作为一个区段的工程的一部分。

1.26 “Site” means the places provided by the Employer where the works are to be
executed and any other places as may be specifically designated in the Contract as
forming part of the site.

1.26 现场是指由雇主提供的用于进行工程施工的场所以及在合同中可能明确指
定为现场组成部分的任何其他场所。

 

国际承包工程合同(中英完整版) 下载链接: https://u253469.ctfile.com/fs/253469-231950848

欢迎关注 “找知博客 ” 获取更多,如链接失效,请微信博主

微信号: slvx399399(司令微信首字母缩写+399399)

 

本文来自网络,不代表找知博客立场,转载请注明出处:http://zhaozhiyong.cn/1439.html

作者: 于老大

关注微博
返回顶部
//