建设工程设计合同

Construction Project Design Contract

项目名称:

Project Name:

项目建设地点:

Project Location:

合同编号:

Contract No.:

设计证书等级:

Grade of Design License:

委托方:

Client:

承接方:

Design Firm:

签订日期:

Signed on:

委托方(甲方):

Client (Party A):

承接方(乙方):

Design Firm (Party B):

甲方委托乙方承担 XX 项目(一期)工程设计,经双方协商一致,签订本
合同。

Party A entrusts Party B to undertake the design for . This Contract is
made by the two parties after their mutual agreement.

第一条 本合同依据下列文件签订

Article1. This Contract is made on the basis of the following documents:

1.1《中华人民共和国合同法》、《中华人民共和国建筑法》和《建设工程勘察设
计市场管理规定》。

1.1 The Contract Law of the People’s Republic of Chin, The building regulations of
the People’s Republic of China and The developmental Law of the People’s Republic
of China.

1.2 国家及地方有关建设工程勘察设计管理法规和规章。

1.2 Relevant Building & Design Codes and Regulations of the State and of the
Shanghai Municipality.

1.3 建设工程的相关批准文件。

1.3 The approval documents that are required for this construction project.

第二条 本合同工程设计项目的名称、地点、规模、投资、内容及标准

Article2. The name, location, size, investment sum, function, design contents and
standards:

2.1 工程项目的名称:XX 项目(一期)

2.1 Project name:

2.2 工程项目的地点:

2.2 Project location:

2.3 工程项目的规模:总建筑面积约 平方米(其中地下面积约 平方
米),高度 米。

2.3 Project size: The total floor area is approximately ㎡(of which the floor area
of the underground area is ㎡), the total height is m.

2.4 工程特征及附注说明:商业办公综合楼

2.4 Project features & remarks: A commercial cum office building complex

2.5 工程项目的投资总额:控制在 亿元人民币以下

2.5 Project investment in total: Controlled Within million yuan RMB

2.6 工程项目的设计内容及标准:红线内的建筑、结构、机电、总体设计(包括
3000㎡人防设计,不包括精装修设计、园艺设计和艺术泛光照明等专业设计),
施工图设计约为 70000㎡(不包括五层到七层的 SOHO 区域)。

2.6 Design requirements and scope of work: The scope of work shall include master
planning and building design that are located within the boundary line. For building
design it shall comprise of the architectural, structural & M/E work. (including 3,000
㎡ of Air-raid shelter design, but excluding other specialists’ design, such as the
Luxurious Interior Design, Landscaping Design and Facade Flood Lighting Design).
The total floor area during the working drawing stage is 70,000㎡ (excluding the
SOHO Area, which is starting from the fifth floor level to the seventh floor level).

第三条 甲方向乙方提交的有关资料及文件(见下表)

Article3. Relevant documents which shall be issued by Party A to Party B:

序号

资料及文件名称

份数

提交时间

备注

S/N

Name of documents

Copies

Submission Date

Remarks

全套

Full set

1

2

3

4

5

政府批文

Government Approval Documents

设计任务书

Design Instructions

规划红线图

Plan of Property Line

水、电、气源落实情况说明

Design Information of Utilities (water,

electricity & gas supply etc.)

规划设计要求

1

1

1

1

1

6

7

8

Requirements from the Government

地址勘探报告

Soil Investigation Report

原打入桩的资料

Design Information of As Built pilings

概念方案

Concept Design Information

1

1

1

第四条 乙方向甲方交付的设计文件(见下表)

Article4. Design documents which shall be submitted by Party B to Party A (listed as
follows):

序号

设计文件名称

S/N

Design Documents

方案设计文件

Schematic Design Documents

Schematic

初步设计文件

D.D. Documents

初步概算文件

Preliminary Estimate

扩初

E.P.D.

扩初

E.P.D.

阶段

Phase

方案

份数

提交时间

备注

Copies

Submission Date

Remarks

10

15

2

30 天内

Within 30 days

30 天内

Within 30 days

7 天内

Within 7 days

1

2

3

4

施工图设计

施工图

15

桩位图扩初批准后 15 天

Working Drawings

Construction

Documents

The piling drawings will be submitted

within 15 days after

the D.D.

Approval

其余扩初批准后 60 天

The rest of the drawings will be

submitted within 60 days after the

D.D. Approval

5

光盘文件

施工图

1

待定

CD files

C.D.

To Be Decided

注:设计文件深度按照《建筑工程设计文件编制深度规定》(建设部2003 年4 月版)执

行。

Notes: The design documents shall be prepared in compliance with the Regulations on detail

requirements of design documents for construction project (issued by Ministry of construction

dated in April, 2003).

第五条 设计费用及支付方法

Article 5. Design fee and the mode of payment:

5.1 甲方应支付本合同项目的设计费为
(含所有乙方应缴纳的税费及其它政府规定应由乙方交纳的款项)

5.1 Party A shall pay the design fee of RMB yuan for this project to Party B (this
fee shall include taxes and all other duties that should be paid by Party B as required
by the government regulations).

5.2 支付方法(见下表):

5.2 The payment method is (listed as the following):

序号

阶段

S/N

Phase

金额(元)

说明

Amount

Remarks

(yuan)

1

2

3

4

方案阶段

合同签订后 30 日内

Schematic design

30 days after Contract is signed

扩初阶段

扩初批准后 30 日内

Design Development

30 days after D.D. Approval

施工图阶段

施工图提交审图后 30 日内

Construction Document

30 days after the C.D. Approval by

the Authority.

施工配合

Construction

coordination

总包施工合同签订后 30 日内

施 工 配 合

30 days after the main contractor has

585,000.00

been awarded

工 程 开 工 后 , 按 季 度 分 五 期 支

 

建设工程设计合同(中英文)-secret 下载链接: https://u253469.ctfile.com/fs/253469-231950911

欢迎关注 “找知博客 ” 获取更多,如链接失效,请微信博主

微信号: slvx399399(司令微信首字母缩写+399399)

 

本文来自网络,不代表找知博客立场,转载请注明出处:http://zhaozhiyong.cn/1496.html

作者: 于老大

关注微博
返回顶部
//